Command Centre
Live AEROLENS programme status. KPIs computed from the shared Issue Register, Lessons Register, Interim Measure tracker, and Brief Benchmark observations — updated in real time as the team logs evidence.
Issue Register
The browser-local source register. Seeded records are reference examples. Add observations and references here, then explicitly adopt them into Lesson to design for accountable review. Names and edits are not authenticated.
| Ref | Title | Zone | Classification | Severity | Status | Logged By | Images | When |
|---|
Lessons Register
Issues that have been converted into Phase-2A non-negotiables. Each lesson has a root cause, impact quantification, and an enforceable prevention control.
Interim Measure Tracker
Issues classified as Interim Measures. Each tracked through formal Design Authority resolution via Routes A (formalise), B (compliant upgrade), C (permanent design), or D (removal).
Simulation Centre
Year 1 scenario programme. Every simulation must carry a Calibration Statement confirming model variance below 15% vs observed data before outputs are decision-grade.
Q2 2026 — Quarterly Review Pack
Fixed-format CIO decision pack, generated live from the Issue Register and Lessons data.
Team & Active Users
Everyone who has contributed to the AEROLENS shared workspace. Activity counts are computed from their contributions to the Issue Register.
Reports & Analytics
Pattern analysis derived from the Issue Register data. Each report turns raw observations into actionable Phase-2A planning intelligence.
Terminal Brief Benchmarks
Phase-1 (12 MPPA) and Phase-2 (30 MPPA) planning assumptions from the Terminal Combined Program Brief, tracked against actual observed performance. Variances flag where Phase-2 assumptions must be revised before Phase-2A procurement begins.
Finishes Quality
Per-finish-family inspection records across the terminal. Tracks defect rate, junction consistency, and standard adherence — surfacing where the AEROLENS dossier's "max 12 finish families" discipline (Section 4A.5) is or is not being maintained.
Finish Family Compliance — Phase-1 Snapshot
Each tile shows total inspections logged, defect rate, and last inspection. Click any family to filter records below.
Snag & Punch List
Unfinished, incorrect, damaged, or non-compliant work tracked through to verified rectification. Critical for HOTO governance per Section 4.5 of the dossier — completion is not declared until the punch list is closed and verified.
Import · Export · Reports
Bulk-load historical data via Excel, export the full register at any time, or generate formatted reports for the CIO, site teams, and Phase-2A planning. All data lives in your browser — exports give you the portable copy.
Import from Excel
Bulk-load existing records. Each module has a downloadable template — fill it, drop it back here, and rows will be added to the platform.
Export Data to Excel
Download the current platform data as a spreadsheet — for backup, external analysis, or sharing with stakeholders who don't have access to the platform.
Generate Formatted Reports
Polished documents formatted for distribution. Word for editable deliverables, PDF for site teams and external sharing, Excel for category-wise analytics.
Backup & Restore
Full JSON backup of all platform data. Use this to move data between browsers, restore after a clear, or create a snapshot.
Face of the Terminal
Design and aesthetic gate review for all operational projects added to the live terminal — signage, retail buildouts, queue furniture, kiosks, plant enclosures, advertising. Without this gate, ad-hoc commercial fitouts erode the architectural language Phase-1 was designed to deliver.