← AERONOVA TIA / GENESISRecovered GENESIS v4.2 · Concept sizing, simulation, options and finance. Seed values are illustrative. AI services are not connected in this edition.
AERONOVA · GENESIS
TOTAL INTELLIGENCE FOR AIRPORTS · v4.2
● Concept & intellectual property: Gaurav Vatsa, Chief Conceptualizer of Aeronova  |  All rights reserved  |  Calculation workspace · AI connection pending
9 ML algos·65 processors·7 deliverables
KF
AERONOVA Genesis
MASTER PLAN BRIEF TOOL
recalc ready
v3.0 · Apr 2026
1Inputs
›
2Simulate
›
3Suggested Processors
›
4Customize
›
5Layouts
›
6Brief
›
7Finance
1

Project Inputs

Configure the brief on the left panel — every change cascades through all 6 steps
📋 Setup Checklist
① Pick a Location — auto-fills climate, regulator, capex factor, and KF socio-economic indices
② Set Demand — toggle BPH / MPPA, enter peak hour pax or annual capacity
③ Footprint — site area, terminal width × depth, levels, international share
④ Aircraft & Fleet Mix — critical aircraft + 8 aircraft type sliders
⑤ Climate & Wind — elevation, temperature, primary wind heading
⑥ Functions on Site — passenger / cargo / MRO / FBO / military toggles
⑦ Cityside Aspirations — aerocity / hotel / office / logistics / retail
⑧ Operations Standards — equipment level, LoS target, redundancy philosophy, realistic ops mode
⑨ (Optional) Upload DDFS — CSV flight schedule for true-to-life simulation
📍 Current Project Profile
🗺 Site Master Plan — Area Coverage Visualisation
Site Allocation — full master plan land use breakdown
Functions on Site (passenger + cargo + MRO + FBO + military)
FunctionStatusScaleArea (m²)
Cityside / Aerocity Aspirations
Land useQuantumGFA (m²)
Runway Configuration & Capacity
Critical Aircraft (derived from fleet mix)
ATC Tower Siting
Navaids Placement (per ICAO Annex 10 + Annex 14)
Taxiway System (parallel · RET · RAT · holding bays · end-around)
Apron Features (blast pads · service roads · run-up · de-icing · compass · wash · fuel farm · RFFS)
Runway sizing — FAA AC 150/5325-4B simplified
Airside top-down view (runway · taxiway · apron · stands)
Apron & stands (ICAO Annex 14)
Stand classCountBox (m)Area (m²)
Movements capacity (Horonjeff 5e Ch. 10)
ItemValue
Wind rose & declared distances (FAA AC 150/5325-4B + ICAO Annex 14 §3.4)
Stand utilisation timeline — 6-hour peak window with MARS swing logic
Discrete-event simulation · 4-hour peak window · stochastic show-up curve · service-time variability
Headline metrics
Pax simulated
—
Avg dwell
—
Bottleneck
—
% in target LoS
—
Queue length over time
Wait time distribution per processor
ProcessorPaxAvg waitP95 waitMax queueVisual
Click RUN SIMULATION to generate metrics
Throughput over time
📊 LoS Compliance Report (IATA ADRM 11)
ProcessorOver-Design %Optimum %Sub-Opt %Failure %Verdict
Run sim to populate
Verdict thresholds: PASS ≥80% in Optimum or better · MARGINAL ≥80% in any LoS · BELOW LoS >20% Sub-Opt+Fail · FAIL >5% Failure
⚠ Stress Test Scenarios
ScenarioBPHAvg DwellMax QueueBottleneckFirst Failure
Click button to run 6 scenarios (baseline · +25/50/100% demand · 1 lane down · combined)
🔥 Drive-to-Failure Analysis
OrderProcessorFails atSaturates atFailure BPHOperational Impact
Click to ramp demand 100→300% and find each processor\'s breaking point