AAI ROUND 3 / AUDITABLE BID ASSISTANCE STUDY

AAI Bid Assistance Study

Five proposed airport groups. Eleven airports. A transparent investment case with explicit evidence, assumptions and funding obligations.

Published by Aeronova TIA Consultancy. Research basis and model snapshot: 3 November 2026.

Open the bid assistance study →Read the 285-page appraisal PDF

Published layouts and future masterplans

Inspect 84 attributed map plates across all eleven airports: aerodrome and parking layouts, obstacle charts, located safeguarding maps and dated authority expansion drawings. Existing configurations, AAI proposals and Aeronova TIA study options carry separate labels. Certified as-built sets and missing current approved masterplans remain explicit evidence requests. Varanasi distinguishes the 6 MPPA new terminal from the 9.9 MPPA airport-wide target.

Executive decision flow

Open a management briefing with the current investment verdict, portfolio signals and decision gates. Move through bundle intelligence, capital and bid strategy, growth projects, the spatial twin and the evidence library. Single-variable NPV tests, funding timelines and a committee-note export connect the findings to action. Detailed controls and source tables open when needed; the analyst laboratory and continuous study remain available.

Investment and operating decisions

Accuracy and investment gates

The default protected conclusion is Hold / restructure at a hypothetical ₹500 crore total upfront/CWIP allowance per bundle. This is a model result, not a statement that the final transaction has those terms or is intrinsically unviable. Final Round 3 tender, concession, tariff, transferred-asset, land and mandatory-work conditions were not verified in the snapshot. Fees and business improvements remain conditional.

Maps, safeguarding and transport

Dated AAI primary runway geometry, mapped OSM footprints/streets, assumed heights, schematic equipment banks, flat terrain and conceptual project reservations are labelled separately. The LOD 200 coverage is incomplete and is not a surveyed as-built inventory. Illustrative OLS do not constitute height clearance, an approved airport masterplan or an engineering survey. Catchment rings are geographic assumptions rather than road-time isochrones or observed flyer origins. All transport fares, travel times, capture shares and operator costs are pilot assumptions. No unproven incremental air traffic is credited to the access programme.