AERONOVA TIA / AEROPLANNER PRO / CONNECTED APPLICATION
Airport masterplanning workspace
Plan a new airport or develop an operating one: site evidence, growth scenarios, hub strategy, infrastructure, phasing and the masterplan report.
The connected application runs at aeronovamp.netlify.app. Save its project file before leaving. If your browser restricts embedded storage or downloads, use the full-window link above.
Source retrieval, calculations and reports run in the connected application. Expanded AI prose depends on its model configuration. The suite and masterplanner keep separate browser storage; no shared login, database or automatic project synchronization is implied.
Continue a masterplan in the suite
In the masterplanner, choose Save project file or export the evidence pack. Open that JSON file here to review its planning record and transfer selected inputs to GENESIS or ARDI.
The file is read on this device. Only the inputs you choose move between the suite’s pages.
Source trajectory
Continue in GENESIS
Carry the adopted traffic baseline and compatible planning factors into the concept demo. Review the mapping before continuing.
Review transferred inputs and remaining demo assumptions
Continue a route in ARDI
Choose a route and confirm the share of its two-way O&D market belonging to departures from this airport. The default 50% assumes a balanced market. Transfer, codeshare and stopover effects stay in the masterplanner.